NOTE
Save the packing case and packaging material as they can be used if the equipment must be reshipped.

3.2 Preparation for Installation

3.2.1 Preparation for Installation Site

1.
Ensure that the site meets all safety, environmental and power requirements
2.
Check that required power sockets are available.
3.
Check that a network connector is available if the monitor needs to be connected to the wired network.
WARNING
Use only the power cord or DC adapter provided with the system.
Environmental Requirements
To avoid explosion hazard, do not use the equipment in the presence of flammable anaesthetics, vapors or liquids. The
environment where the monitor will be used should be free from vibration, dust and corrosive substances. If these
conditions are not met, the accuracy of the system may be affected and damage may occur.
The environmental specification is as follows:
Main unit
Item
Temperature (°C)
Relative humidity (noncondensing)
Barometric (kPa)
Microstream CO
module
2
Item
Temperature (°C)
Relative humidity (noncondensing)
Barometric (kPa)
Sidestream CO
module
2
Item
Temperature (°C)
Relative humidity (noncondensing)
Barometric (kPa)
3-2
Operating conditions
0 to 40
15% to 95%
57.0 to 107.4
Operating conditions
0 to 40
15% to 95%
57.3 to 105.3
Operating conditions
5 to 40
15% to 95%
57.3 to 105.3
Storage conditions
-30 to 70
10% to 95%
16.0 to 107.4
Storage conditions
-20 to 60
10% to 95%
57.3 to 105.3
Storage conditions
-20 to 60
10% to 95%
57.3 to 105.3