Henny Penny 500 Technical Manual page 170

Electric/gas cfa pressure fryer
Hide thumbs Also See for 500:
Table of Contents

Advertisement

Inspection 3
Rev A
HO7RN type.
To install the power cord, follow these procedures:
1. Remove the right side panel of the unit.
2. Install the cord, with a strain relief, to the junction box.
3. Attach the wires to the terminal block according to the wiring
diagram on the side panel.
CE units require a minimum wire size of 4mm to be wired to
the terminal block. If a flexible power cord is used, it must be
HO7RN type.
To install the power cord, follow these procedures:
1. Remove the right side panel of the unit.
2. Install the cord, with a strain relief, to the junction box.
3. Attach the wires to the terminal block according to the wiring
diagram on the side panel.
4. Pull the slack out of the cord and thread it down through the
the clamp on the frame, at the rear, left leg of fryer. Then run
the cable under the frame and out the rear of the fryer, so it
doesn't interfere with the filter drain pan.
The filter drain pan must be as far back under fryer as
it will go, and the cover in place. Be sure the hole in the
cover lines up with the drain before opening the drain.
Failure to follow these instructions causes splashing of
shortening and could result in personal injury.
The supply power cords shall be oil-resistant, sheathed flexible
cable, no lighter than ordinary polychloroprene or other
equivalent synthetic elastomer-sheathed cord.
1219 US 35 West P.O. Box 60 Eaton, OH 45320 (937)456-8400 Fax (937)456-8402 www.hennypenny.com

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

600

Table of Contents