GE C70 Instruction Manual page 476

Capacitor bank protection and control system ur series
Hide thumbs Also See for C70:
Table of Contents

Advertisement

10.1 MODULES
To properly insert a module, ensure that the correct module type is inserted into the correct slot position. The ejector/
inserter clips located at the top and at the bottom of each module must be in the disengaged position as the module is
smoothly inserted into the slot. Once the clips have cleared the raised edge of the chassis, engage the clips simultaneously.
When the clips have locked into position, the module will be fully inserted.
CPU connections must be individually disconnected from the module before the module can be removed from the
chassis.
NOTE
NOTE
10
10-2
C70 Capacitor Bank Protection and Control System
10 MAINTENANCE
GE Multilin

Advertisement

Table of Contents
loading

Table of Contents