9.4 SETTING EXAMPLE

9.4SETTING EXAMPLE
Consider protection of a capacitor bank with the following characteristics:
V
= 138 kV fuseless.
LL
Q
= 21 Mvar.
B
Two parallel strings (S = 2) in each phase with N = 7 capacitor units rated Q
Each capacitor unit consisting of n = 6 series capacitors.
Refer to the diagram below for details. Phase capacitors are connected to ground through a neutral capacitor rated
Q
= 167 kvar, V
= 0.825 kV.
CN
CN
50/5A
167KVAR,
825V
Based on the bank configuration, CT connections, and VTs connections, a C70 model is chosen with three CT/VT modules:
two type 8L modules (in slots F and U) and one type 8V module (in slot M) to provide following protection functionality.
Negative-sequence instantaneous overcurrent (ANSI 50_2) to provide fast backup protection against arcing within
capacitor bank.
Phase overvoltage (ANSI 59B) to provide protection against overvoltages.
Bank overcurrent protection, phase instantaneous overcurrent (ANSI 50P), neutral instantaneous overcurrent (ANSI
50N) and phase time overcurrent (ANSI 51P) to provide protection against major faults within the capacitor bank.
Bank undervoltage (ANSI 27P) to detect loss of bus voltage and trip the bank.
Voltage differential (ANSI 87V) to detect failure of one or more capacitor elements in a given string. Three voltage dif-
ferential elements can be set for this application: one between two tap voltages (ANSI 87V-1) and two between the bus
9
voltage and tap voltage in both strings (ANSI 87V-2 and 87V-3).
Phase current unbalance (ANSI 60P) to detect failure of one or more capacitor elements in a given string.
The CT and VT connections are shown in the figure above. The CT channels are connected as follows.
The type 8L CT/VT module F1 to F3 three-phase CT channels are connected to the bus side three-phase CTs with a
120 / 5 A ratio.
9-12
138 kV
120/5A
`
1250/250 V
Figure 9–12: SAMPLE CAPACITOR BANK CONFIGURATION
C70 Capacitor Bank Protection and Control System
= 500 kvar, V
C
C70 CAPACITOR BANK RELAY
50_2
51P
50P
59B
138 kV/
0.115 kV/
3
500 kvar
11620 V
87V
9 APPLICATION OF SETTINGS

9.4.1 DESCRIPTION

= 11.62 kV.
C
51N
27P
60P
(C)
60P
(B)
60P
(A)
834764A1.CDR

9.4.2 VT AND CT SETUP