INITIAL COMMISSIONING

NOTE
This section allows you to perform the quick commissioning of the Top Control positioner. The not essential
additional functions are not described in this section. See chapter 5 and 6 for complete explanations about
commissioning and the functions available.
4.1

Pneumatic connection

Install the valve according to the specific requirements.
Connect the air supply (3..7 bar, instrument air, oil, water and duster) to port 1.
Mount the exhaust air pipe or noise reducer on port 3.
4.2

Electrical connection

a) Multipole connection
Connect the external position setpoint signal to the
circular connector M16.
Connection of the circular connector M16:
Pin
Assignment
B
Setpoint +
A
Setpoint GND
Connect the power supply to the circular connector M12.
Connection of the circular connector M12 :
Pin
Assignment
1
+ 24 V
2
not connected
3
GND
4
not connected
84
Fig. 4.1: TopControl with multipole connectors
(0/4..20 mA)
B
or
0..5 / 10V
A
1
3
M16
External connection
+ (0/4..20 mA) or 0..5 / 10V
GND
External connection
24 V DC ± 10 %
Residual ripple 10 %
M12
Operating instructions no. 800607