Kubota M8540 Workshop Manual page 185

Hide thumbs Also See for M8540:
Table of Contents

Advertisement

M8540, M9540, WSM
Crankcase 2
1. Remove the crankcase 2 (1).
(When reassembling)
IMPORTANT
• Make sure the crankcase 1 and 2 are clean.
• Apply liquid gasket (Three Bond 1217D) to the crankcase 2
as shown in the figure.
• Tighten the crankcase 2 mounting screws with even force on
the diagonal line.
• Confirm that the liquid gasket coating surface is free of
water, dust and oil in order to maintain sealing effect.
• Carefully apply the adhesive evenly.
NOTE
• When mounting the adhesive-applied parts, take care to fit
them to the mating parts.
• Assemble the adhesive-applied parts within ten minutes.
Crankcase 2 mounting
Tightening torque
screw
(1) Crankcase 2
Crankcase 1 and Crankcase 2
(When reassembling)
• Match the crankcase 1 and 2, referring to the flywheel housing's
contoured face.
• Tighten the crankcase 2 mounting screws loosely.
• Tighten up the jig to the specified torque same as the flywheel
housing screw.
This helps to minimize the level difference
between the crankcase 1 and the crankcase 2 (at the flywheel
side). Possible gap must be 0.05 mm (0.002 in.) or smaller.
Crankcase 2 mounting
screw
Flywheel housing
Tightening torque
mounting screw
(M14, USB)
Flywheel housing
mounting screw (M12, 9T)
(1) Crankcase 1
(2) Gap to be smaller than 0.05 mm
(0.002 in.)
(3) Flywheel Housing
1-S62
ENGINE
49 to 55 N·m
5.0 to 5.7 kgf·m
37 to 41 lbf·ft
(2) Liquid Gasket
W1060825
49 to 55 N·m
5.0 to 5.7 kgf·m
37 to 41 lbf·ft
167 to 196 N·m
17.0 to 20.0 kgf·m
123 to 144 lbf·ft
103 to 117 N·m
10.5 to 12.0 kgf·m
76.0 to 86.8 lbf·ft
(4) Crankcase 2
(5) Jig
W1111351
KiSC issued 09, 2008 A

Advertisement

Table of Contents
loading

This manual is also suitable for:

M9540

Table of Contents