GE T35 Instruction Manual page 130

Transformer management relay ur series
Hide thumbs Also See for T35:
Table of Contents

Advertisement

5.3 SYSTEM SETUP
3.
Configure Source n (Source 2 for this example) as the current from CTY in Winding 1 in the
!"
SOURCES
SOURCE n
"WDG 1Y"
SOURCE 2 NAME:
SOURCE 2 PHASE CT:
SOURCE 2 GROUND CT:
SOURCE 2 PHASE VT:
SOURCE 2 AUX VT:
4.
Configure Source n (Source 3 for this example) to be used as the current in Winding 2 in the
!"
NAL SOURCES
"WDG 2"
SOURCE 3 NAME:
SOURCE 3 PHASE CT:
SOURCE 3 GROUND CT:
SOURCE 3 PHASE VT
SOURCE 3 AUX VT:
5.
Configure the Source setting of the transformer windings in the
tings menu.
WINDING 1 SOURCE:
WINDING 2 SOURCE:
WINDING 3 SOURCE:
SETUP METHOD B (ALTERNATE)
This approach adds the current from each phase of the CT1 and CT2 together to represent the total winding 1 current. The
procedure is shown below.
5
1.
Enter the settings for each set of CTs in the
Method A above.
2.
Configure Source n (Source 1 for this example) to be used as the summed current in Winding 1 in the
!"
SIGNAL SOURCES
"WDG 1"
SOURCE 1 NAME:
SOURCE 1 PHASE CT:
SOURCE 1 GROUND CT:
SOURCE 1 PHASE VT:
SOURCE 1 AUX VT:
3.
Configure Source n (Source 2 for this example) to be used as the Winding 2 current in the
!"
SOURCES
SOURCE n
"WDG 2"
SOURCE 2 NAME:
SOURCE 2 PHASE CT:
SOURCE 2 GROUND CT:
SOURCE 2 PHASE VT:
SOURCE 2 AUX VT:
5-52
settings menu.
"F5"
"None"
"None"
"None"
settings menu.
SOURCE n
"M1"
"M1"
: "None"
"None"
"WDG 1X"
"WDG 1Y"
"WDG 2"
SYSTEM SETUP
!"
settings menu.
SOURCE n
"F1 + F5"
"None"
"None"
"None"
settings menu.
"M1"
"M1"
"None"
"None"
T35 Transformer Management Relay
!"
SYSTEM SETUP
TRANSFORMER
!
!
AC INPUTS
CURRENT BANK
5 SETTINGS
!"
SYSTEM SETUP
SIGNAL
!"
SYSTEM SETUP
SIG-
!"
set-
WINDING n
settings menu, as shown for
SYSTEM SETUP
!"
SYSTEM SETUP
SIGNAL