Partner K 650/700 Active Workshop Manual page 81

Petrol
Table of Contents

Advertisement

7
80
Cutting equipment
Remove spacer sleeve (A), the screws,
plastic cover, cover washer, plastic was-
her, rubber washer and a further plastic
washer.
Lift the protective cover away.
A
505 38 13-08
Dismantle the cutter arm's ball bearings.
502 50 82-01
Assembly
Mod. 650, 700
Clean and check the different parts.
Heat the cutter arm and fit new ball
bearings. Do not forget the spacer ring
between the ball bearings!
If necessary fit new retaining screws.
504 91 28-00
Apply a little grease on the indicating
washer and put it on the guard. Place the
thick rubber washer on the indicating
A
washer.
B
Remove spacer sleeve (A), the screws,
plastic cover, cover washer, plastic was-
her, rubber washer and a further plastic
washer.
Lift the protective cover away.
Heat the cutter arm with a hot air gun to
approx. 150°C and dismantle the ball
bearings. If necessary use a suitable drift
(502 50 82-01) and hammer.
Assembly
Mod. 650, 700
Clean and check the different parts.
Replace the cutter arm's retaining screws
if the threads are damaged. Tap out the
screws with a hammer.
Heat the cutter arm with a hot air gun to
approx. 150°C and fit a new ball bearing.
Do not forget the spacer ring between the
ball bearings and make sure that they are
pressed down well against the shoulder.
If necessary fit new retaining screws while
the cutter arm is hot.
Apply a little grease on the indicating
washer (A) and put in on the guard.
Thereafter place the thick rubber washer
(B) on the indicating washer and then put
on the guard.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

K 950/1250 active

Table of Contents

Save PDF