Setting Running Day; Setting Holiday - Hitachi FSG1 Series Technical Catalogue

Set-free outdoor and indoor units
Table of Contents

Advertisement

REMOTE CONTROLLERS OPERATION
11
/16

11.4.4. SETTING RUNNING DAY

<Function>
To set the day for actual operation of the running schedule set before. (Though the ON time
and OFF time are set, the schedule operation is not available unless the running day is set.)
<Example> "B" pattern, Tuesday
1. Depress the "SET/MONITOR" switch.
The timer is changed to the setting mode, the "SET" indication is turned on and the "J" mark
are flickered.
2. Select "A" or "B" pattern by depressing the "A/B" switch.
The right figure shows the case of selecting the set pattern "B"
3. Select the running day by depressing the "DAY" switch.
Refer to 3. of "Setting ON/OFF Time" for the indication of the "J" mark.
The right figure shows the case of selecting the day "Tuesday".
4. Depress the "RUN DAY" switch, the selected day is set as the running day and the "G G G G "
mark is turned on at the selected day.
By depressing the "RUN DAY" switch again, the running day setting is canceled and the "G"
mark is turned off.
The right figure shows the case of selecting the day "Tuesday".
5. Depress the "SET/MONITOR"
The "SET" indication is turned off and the control timer is changed to the monitor mode.

11.4.5. SETTING HOLIDAY

<Function> To cancel the running schedule temporarily.
The schedule operation is canceled only once at the day set as "holiday". After that, the
schedule operation is available again. This function is used in case that there are any
irregular holidays.
(<Example> "B" pattern, Tuesday
1. Depress the "SET/MONITOR" switch.
The timer is changed to the setting mode, the "SET" indication is turned on and the "J" mark
are flickered.
2. Select "A" or "B" pattern by depressing the "A/B" switch.
The right figure shows the case of selecting the set pattern "B"
3. Select the day to be set as "holiday" by depressing the "DAY" switch.
Refer to 3. "Setting ON/OFF Time" for the indication of the "J" mark.
The right figure shows the case of selecting the day "Tuesday".
4. Depress the "HOLIDAY" switch, the "HOLI" indication is turned on and the selected
day is set as "holiday".
In the case that the selected day is not set as running day the "G" mark is turned off. The
holiday setting is not available for the day. (In case that all days of a week are selected, only
the running day is set as "holiday").
By depressing the "HOLIDAY" switch again, the holiday setting is canceled.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fsg seriesFxg seriesFxg1 series

Table of Contents