6. TEST RUNNING

6.1 Final Installation Check

Inspect the installation work according to all documents and drawings. Table 2 shows the minimum
checkpoints.
INSTALLATION
W ORK
1. Is the unit solidly mounted and leveled?
2. Is the installation location adequate?
Space for Condenser Air Flow
Space for Maintenance Work
Noise and Vibration
Sunshine and Rainfall
Appearance
3. Is the ducting work adequate?
Filter
Size and Length
4. Are the condensate drain lines properly arranged?
Trap
5. Is the electrical wiring system adequate?
Wire Size
Switch Size
Fuse Size
Voltage
6. Have the shipping washers been removed from the rubber-mounted compressor?

6.2 Preparation

Tools and Instruments
Compound Gauge(s), An Electric Tester, and
General Tools.
Preparation – Confirm that the system switch on
the room thermostat is at the OFF position.
Pressure Gauges
Equip high and low pressure
compound gauges according to Fig. 11.
Thermostat
Set the thermostat at a lower
temperature than the room temperature.
Table 2. Installation W ork Check List
CHECK
LIST
High and Low Pressure
Soundproofing
Insulation
Drain Ditch
Tightened Connections
Operation Control Devices
Safety Devices
Hz
6.3 Test Running
Test running should be performed as follows, when
the unit is wired according to the wiring label.
1. Set the operation switch to the F AN position
and the system switch to the ON position, and
the evaporator fan will start immediately.
Check the rotation direction, fan speed and air
flow quantity through the evaporator.
2. Set the operation switch to the COOL position,
and the compressor and condenser fans will
start 3 minutes after this operation (refer to Fig.
9).
3. After system operation has become stabilized,
check the suction and discharge pressures on
the
compound
gauges.
pressures are shown in Fig. 10.
4. Check the operating voltage, phase balance
and operating current.
5. Check to ensure that the thermostat functions
properly.
6. Check to ensure that the control and protective
devices function properly (refer to Table 3).
TEST RUNNING
Normal
operating
7