Propshaft U-Joint Service - Polaris Ranger RZR XP 900 2011 Service Manual

Table of Contents

Advertisement

FINAL DRIVE
4.
Force V-joint cross to one side and lift out of inner yoke.
I
2.
Tighten vise to force bearing caps in.
Assembly
1.
Install new bearing caps in yoke by hand. Carefully install
V-joint cross with grease fitting properly positioned
inward toward center of shaft. Take care not to dislodge
needle bearings upon installation of cross joint.
3.
Support V-joint in vise as shown and drive inner yoke down
to remove remaining bearing caps.
Always wear eye protection.
A
CAUTION
2.
Support inner yoke as shown and drive outer yoke down
(bearing cap out) with a soft face hammer.
Disassembly
1.
Remove internal or external snap ring from bearing caps.
NOTE: If yoke or bearing is removed, cross bearing
must be replaced. Note orientation of grease fitting
and mark inner and outer yoke for correct re-
positioning during installation.
PROPSHAFT U-JOINT SERVICE
7.11
9923144 - 2011 RANGER RZR XP 900 Service Manual
©
Copyright 2011 Polaris Sales Inc.

Advertisement

Table of Contents
loading

Table of Contents