Polaris Ranger RZR XP 900 2011 Service Manual page 117

Table of Contents

Advertisement

I
13. Install new bolts and tighten evenly until snug.
14. Torque connecting rod bolts to specification.
C
=T
Connecting Rod Bolts:
Step 1: Torque to 13 ft. Ibs. (18 Nm)
Step 2: Tighten an additional 105° ± 3°
Balance Shaft Installation
IMPORTANT: Whether installing a new balance shaft
or re-installing the original, refer to bearing selection
chart
(see
"Balance
Shaft
Bearing
Selection"
procedure in this chapter).
1.
Clean the upper crankcase balance shaft bearing bore
surfaces.
2.
Align tab of new balance shaft bearings (A) with the slot
in each bearing bore of crankcase. Press bearing insert
firmly into place.
ENGINE I COOLING
3.
Rotate the crankshaft until the alignment dot (B) on the
crankshaft MAG end gear is visible.
4.
Apply Polaris PS-4 Plus engine oil to both balance shaft
journals.
Apply
Engine Oil
t
Apply
Engine Oil
5.
Install the balance shaft, placing the tooth with the
alignment dot (C) in-line with the dot (B) on the crankshaft
gear (see reference images below).
3.65
9923144 - 2011 RANGER RZR XP 900 Service Manual
© Copyright 2011 Polaris Sales Inc.

Advertisement

Table of Contents
loading

Table of Contents