Panasonic DP-3510 Service Manual page 287

Digital imaging system
Hide thumbs Also See for DP-3510:
Table of Contents

Advertisement

(10)
(15)
(13)
(16)
Ver. 5.2
(10) Pullout and remove the OPC Shipping Metal
Bracket to unlock the OPC Drum.
(11) Store the OPC Shipping Metal Bracket
removed in step (10) into the 2nd Paper Tray as
(11)
illustrated.
(12) Remove 1 Screw.
(13) Remove the Developer Harness Cover (Clear)
and disconnect the Harness.
(14) Turn the Release Lever Clockwise (90°).
(15) Remove the Developer Unit.
(14)
(12)
(16) Release 3 Latch Hooks and remove the Upper
Developer Cover.
(17) Shake the bottle of developer thoroughly
(approx. 30 seconds).
(18) Pour the appropriate developer evenly into the
developer unit. Make sure to empty the bottle.
(19) Reinstall the Upper Developer Cover.
Note:
When reinstalling, ensure that 3 Latch Hooks are
hooked correctly.
(20) Reinstall the Developer Unit.
(21) Reconnect the Harness, reinstall the Developer
Harness Cover and turn the Release Lever
counter-clockwise.
287
DP-3510/3520/3530/4510/4520/4530/6010/6020/6030
JAN 2006

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents