HP Integrated Lights-Out User Manual page 244

Hp integrated lights-out user guide
Hide thumbs Also See for HP Integrated Lights-Out:
Table of Contents

Advertisement

244
User Guide Integrated Lights-Out
14. Click Overview on the left side of the screen after the verification has taken
Application Launch Using Insight Manager 7
The Application Launch combines the RIBCL, the Lights-Out Configuration
Utility, and the query definition to manage the Group Administration of iLO
management processors.
To create an Application Launch task:
1. Click Device in the navigation bar on the top left side of the screen.
2. Click Tasks to open the Tasks screen.
3. Click New Control Task. A drop-down menu is displayed.
4. Click Application Launch from the dropdown menu to open the Create/Edit
5. Enter the full path and name for the Lights-Out Configuration Utility in the
6. Enter the parameters in the area provided. Insight Manager 7 requires the
7. Click Next. A screen displays the options for naming the task, defining the
8. Enter a task name in the Enter a name for this task field.
9. Select the query that had been created earlier, for example "Mgmt
place. The initial page for devices opens.
Task screen.
area provided. If the CPQLOCFG.EXE file is in the root directory of the C:\
drive, then the path is C:\cpqlocfg.exe.
following parameters for the Lights-Out Configuration Utility:
-F is the full path of the RIBCL file name.
-V is the verbose message (optional).
If the RIBCL file is in the root directory of on the C:\ drive, then the
parameters are:
-F C:\MANAGEUSERS.xml -V
NOTE: The -L parameter cannot designate an output log file. A default
log file named with the DNS name or the IP address is created in the
same directory where CPQLOCFG is launched.
query association, and setting a schedule for the task.
Processors."

Advertisement

Table of Contents
loading

Table of Contents