1 Roadmap and Reference: Installation Roadmap and Task Lists
Checklist 1. Install New G700 with an S8300 (Primary or LSP) Continued
Task
"Set Up SNMP Alarming on the G700"
on page 157
"Complete the Installation of S8300 (if
the Primary Controller)" on page 159
"Complete the Installation Process" on
page 160
32
Subtasks
- Register the system
- Back up the system
- Check planning documentation
- Connect and administer test endpoints
- Complete electrical installation
- Enable adjunct systems
- Check planning documentation
- Connect and administer test endpoints
- Complete electrical installation
- Enable adjunct systems
Installation and Upgrades for G700 with S8300 or S8700
555-234-100 — Issue 3 — May 2003
3 of 3