2 Installing Hardware for the G700 Media Gateway and S8300 Media Server: Installation and Cabling

Power Verification

Check that an adequate number of power outlets are available.Verify that the G700 Media Gateways
and the other equipment in the rack do not present a possible overcurrent or overload to the
customer's branch circuit and/or power distribution strip. Power requirements are listed in
A.
!
WARNING:
Do not overload the power circuit.

Grounding Verification

Ensure that the installation site has access to approved grounds and that either a trained technician or
a licensed electrician will be verifying all grounds and installing the Supplementary Ground
Conductor (consult
!
WARNING:
Installation in a Restricted Access Location and secure access are required in
Finland and Norway.
The G700 Media Gateway relies on two ground connections (mains plug with an earth contact and a
permanent Supplementary Ground Conductor). Because of unreliable earthing concerns in Finland
and Norway, the G700 Media Gateway must be installed in a Restricted Access Location (RAL). An
RAL is defined as an access that can be gained only by trained service personnel or customers who
have been instructed about the reasons for the restricted access and any safety precautions that must
be taken. In these cases, access to the G700 Media Gateway is gained by the use of a tool (such as a
lock and key) or other means of security.
If you have any questions about the safety conditions, contact your Project Manager. When you have
verified that the site is ready for a safe installation, proceed with the installation.

Unpack and Check the Order

Cross-check your customer's order with the planning documentation you have been given. media modules,
telephones and other equipment are listed on your planning and shipping documentation. Placement for the
media modules and other equipment are indicated, as well.
Verify that all necessary elements have been received and are in good condition. If there are missing or
damaged elements, contact the Project Manager for instructions. The planning documentation will list
contact information for the Project Manager and other key personnel.
!
CAUTION:
Wear an anti-static wrist ground strap whenever handling components of an Avaya™ G700
Media Gateway. Connect the strap to an approved ground, such as an unpainted metal
surface.
If you have any questions about the equipment order, or if the equipment has been damaged, contact your
Project Manager. When you have verified that the order is complete and that you have all of the necessary
components and tools, proceed with the installation.
Installation and Upgrades for G700 with S8300 or S8700
555-234-100 — Issue 3 — May 2003
Attach Ground
Conductors).