Preparing For T4000 Router Installation; Overview Of Preparing The Site For The T4000 Router - Juniper T4000 Hardware Manual

Hide thumbs Also See for T4000:
Table of Contents

Advertisement

CHAPTER 5

Preparing for T4000 Router Installation

Overview of Preparing the Site for the T4000 Router

Copyright © 2013, Juniper Networks, Inc.
Overview of Preparing the Site for the T4000 Router on page 57
Rack Requirements for the T4000 Router on page 58
T4000 Clearance Requirements for Airflow and Hardware Maintenance on page 59
To prepare a site for router installation:
Verify that environmental factors such as temperature and humidity do not exceed
1.
router tolerances.
See
"T4000 Router Environmental Specifications" on page
Verify that the site and installation plan meets all safety guidelines and requirements.
2.
See
"General Safety Guidelines for Juniper Networks Devices" on page
Measure distance between external power sources and the router installation site.
3.
See:
T4000 DC Power Distribution on page 343
T4000 DC Power Cable and Lugs Specifications on page 341
T4000 DC Power Requirements on page 338
T4000 DC Power Supply Specifications on page 337
T4000 DC Power System Electrical Specifications on page 336
Locate sites for connection of system grounding.
4.
See
"T4000 Chassis Grounding Cable and Lug Specifications" on page
Calculate the power consumption and requirements.
5.
See
"T4000 DC Power Requirements" on page
Verify that the plan for power installation meets all electrical safety guidelines. See:
6.
T4000 General Electrical Safety Guidelines on page 314
T4000 DC Power Electrical Safety Guidelines on page 320
Verify that your rack meets the minimum requirements for the installation of the router.
7.
333.
293.
335.
338.
57