Initial start-up, inspection, maintenance
Steps - initial start-up, inspection and maintenanc . . .
Commissioning steps
Inspection steps
Maintenance steps
!
!
!
•
•
20. Cleaning the combustion chamber/heating
surfaces and installing the burner
•
•
21. Checking the condensate drain and cleaning the
siphon
•
•
22. Checking the neutralising system (if installed)
•
•
•
23. Checking the diaphragm expansion vessel and
system pressure
•
•
•
24. Checking the function of all safety valves
•
•
•
25. Checking tightness of electrical connections
•
•
•
26. Checking all gas equipment for soundness at
operating pressure
•
•
•
27. Checking the ionisation current
•
•
•
28. Checking the external LPG safety valve (if
installed)
•
29. Matching the control unit to the heating system
•
30. Connecting the control unit to the LON system
(only for weather-compensated control units)
•
31. Implementing a user check (in conjunction with
the LON system)
•
32. Adjusting heating curves (only for weather-
compensated control units)
•
33. Instructing the system user
•
34. Scanning and resetting the "Maintenance" display