Commissioning, Inspec-Steps - Commissioning, Inspection And Maintenance - Viessmann Vitoladens 300-W Installation And Service Instructions Manual

Table of Contents

Advertisement

Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
Commissioning steps
Inspection steps
Maintenance steps
1. Removing the front panel.................................................................................................. 21
2. Filling the heating system................................................................................................. 21
3. Checking the power supply
4. Changing the language (if required)................................................................................. 22
5. Setting the time and date (if required).............................................................................. 23
6. Venting the boiler............................................................................................................... 23
7. Venting the heating system............................................................................................... 23
8. Filling the trap with water.................................................................................................. 24
9. Naming the heating circuits.............................................................................................. 24
10. Function sequence and possible faults........................................................................... 24
11. Standard values for burner adjustment........................................................................... 26
12. Adjusting the oil pressure and checking the vacuum.................................................... 27
13. Adjusting the air volume (static burner pressure).......................................................... 28
14. Cleaning the burner........................................................................................................... 29
15. Replacing the nozzle and checking or adjusting the ignition electrodes..................... 30
16. Cleaning the oil pump filter and replacing it if required................................................. 31
17. Checking the heat exchanger for contamination............................................................ 33
18. Cleaning the heat exchanger............................................................................................ 33
19. Checking the condensate drain and cleaning the trap................................................... 34
20. Checking the neutralising system (accessories)............................................................ 34
21. Checking the active charcoal filter (accessories)........................................................... 35
22. Checking the diaphragm expansion vessel and system pressure
23. Checking all connections on the heating water side for leaks
24. Checking the burner (record values on page 114 of the report)
25. Checking the flue system for unrestricted flow and tightness
26. Checking the safety valve function
27. Checking the firm seating of electrical connections
28. Matching the control unit to the heating system ........................................................... 35
29. Adjusting the heating curves (only for weather-compensated control units).............. 39
30. Linking the control unit to the LON.................................................................................. 41
31. Instructing the system user.............................................................................................. 42
32. Scanning and resetting the "Service" display................................................................. 42
20
Page

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vp3c

Table of Contents