Commissioning, Inspec-Steps - Commissioning, Inspection And Maintenance - Viessmann VITODENS 111-W Installation And Service Instructions Manual

Table of Contents

Advertisement

Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
Commissioning steps
Inspection steps
Maintenance steps
2. Filling the heating system................................................................................................. 37
3. Filling the loading cylinder on the DHW side.................................................................. 39
5. Venting the heating system............................................................................................... 40
6. Checking the gas type....................................................................................................... 40
7. Converting the gas type for operation with LPG............................................................. 41
8. Removing the front panel.................................................................................................. 41
9. Checking the static pressure and supply pressure........................................................ 42
10. Function sequence and possible faults........................................................................... 43
11. Setting the max. heating output........................................................................................ 44
12. Performing an actuator test.............................................................................................. 44
13. Adjusting pump rate of integral circulation pump.......................................................... 45
14. Activating screed drying................................................................................................... 47
15. Leak test on balanced flue system (annular gap check)................................................ 47
17. Removing the burner......................................................................................................... 48
18. Checking the burner gasket and burner gauze assembly.............................................. 49
20. Checking the back draught safety devices...................................................................... 50
21. Cleaning the heating surfaces.......................................................................................... 51
22. Checking the condensate drain and cleaning the trap................................................... 52
23. Installing the burner........................................................................................................... 54
25. Checking the expansion vessel and system pressure................................................... 55
29. Checking all gas equipment for leaks at operating pressure........................................ 57
30. Fitting the front panel........................................................................................................ 57
31. Checking the combustion quality..................................................................................... 57
34. Matching the control unit to the heating system............................................................ 58
35. Adjusting the heating curves............................................................................................ 59
36. Instructing the system user.............................................................................................. 59
32
Page

Advertisement

Table of Contents
loading

Table of Contents