Commissioning, Inspec-Steps - Commissioning, Inspection And Maintenance - Viessmann B1HF Installation And Service Instructions Manual

Table of Contents

Advertisement

Steps - commissioning, inspection and maintenance
Commissioning steps
Inspection steps
Maintenance steps
1. Commissioning the system............................................................................................... 32
2. Filling the heating system................................................................................................. 36
4. Venting the heating system............................................................................................... 37
5. Checking the gas type....................................................................................................... 38
6. Converting the gas type for operation with LPG............................................................. 38
7. Removing the front panel.................................................................................................. 39
8. Checking the static pressure and supply pressure........................................................ 40
9. Function sequence and possible faults........................................................................... 41
10. Setting the maximum heating output............................................................................... 42
11. Performing an actuator test.............................................................................................. 42
12. Adjusting pump rate of integral circulation pump.......................................................... 43
13. Activating screed drying................................................................................................... 44
14. Leak test on balanced flue system (annular gap check)................................................ 44
16. Removing the burner......................................................................................................... 45
17. Checking the burner gasket and burner gauze assembly.............................................. 47
19. Checking the back draught safety devices...................................................................... 48
20. Cleaning the heating surfaces.......................................................................................... 49
21. Checking the condensate drain and cleaning the trap................................................... 50
22. Installing the burner........................................................................................................... 51
25. Checking the expansion vessel and system pressure................................................... 53
27. Checking the electrical connections for firm seating..................................................... 54
28. Checking all gas equipment for leaks at operating pressure........................................ 54
29. Fitting the front panel........................................................................................................ 54
30. Checking the combustion quality..................................................................................... 54
33. Matching the control unit to the heating system............................................................ 56
34. Adjusting the heating curves............................................................................................ 56
35. Instructing the system user.............................................................................................. 56
Commissioning, inspection, maintenance
Page
31

Advertisement

Table of Contents
loading

Table of Contents