Installing The Power Supply - AT&T MERLIN LEGEND Release 3.1 Installation Manual

Communications system
Hide thumbs Also See for MERLIN LEGEND Release 3.1:
Table of Contents

Advertisement

Installing the Power Supply

Installing the Power Supply
!
WARNING:
Do not attach any cables or power cords to the power supply until it is
installed in the carrier.
Do not power up the control unit until all of the modules and power
equipment are installed. Once they are installed, refer to "Powering Up
the System," later in this chapter. Failure to comply with this procedure
can result in shock hazard and or damage to the equipment.
If you are upgrading an older system and a ring generator is specified in
the system forms (Control Unit Diagram), install it in the power supply
before putting the power supply in the carrier. The procedure is detailed
in Maintenance and Troubleshooting.
For expansion carriers with older power supply modules only, a copper
shield must be installed on the power supply before installing it in the
carrier. The procedure is explained in "Installing a Copper Shield," later
in this chapter.
Before touching leads, connectors, pins, and other components, use a
properly grounded wrist strap, to prevent damage from electrostatic
discharge (ESD).
Remove the protective cover from the gold-finger connector (on the
back of the power supply) before inserting it into the carrier.
Installing the Control Unit
2–19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Merlin legend 4.0

Table of Contents