Recovery After Power Failure - AT&T SB67030 System Administrator Manual

Deskset & pstn gateway
Hide thumbs Also See for SB67030:
Table of Contents

Advertisement

AT&T SB67010 Gateway, SB67030 Deskset System Administrator's Guide

Recovery After Power Failure

CAUTION: To help prevent the loss of system data during power outages, plug the AC power plug into an
Uninterruptible Power Supply (UPS).
To restore the system after an AC power failure:
Figure 28. Synchronized Screens
System Description
Allow at least 30 seconds for the Gateway to boot up again after a power
failure. The following power-up initialization sequence occurs:
About twenty seconds after applying power to the Gateway, the POWER
a.
LED turns on, and the Initializing message displays on the screen a few
seconds later.
b. When the Gateway connects to the network, the Synchronizing screen
displays briefly to indicate that the Gateway is in the process of detecting
and synchronizing with other devices on the network.
c.
Once the Gateway has successfully finished synchronizing with the rest
of the system, the Idle screen displays the time, date and the IP Address
as shown in Figure 28.
NOTE: The time and date may not be correct. The time and date
are set using the WEBUI
All devices in the system may power up simultaneously, depending on the
power arrangement of your site. In a large installation, the DHCP server
may take several minutes to respond. This delay may be especially long
after restoration of AC power.
30
"Basic Settings" on page
63.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sb67010

Table of Contents