Replacing a Power Supply

Wait until the rebuild operation is complete. You can check if the rebuild
Step 10
operation is complete by using the show disk details command in EXEC mode.
The physical drive state will be Online and the RAID logical drive state will be
Okay after the rebuild operation is completed.
A 300 GB SAS drive may take up to 5 hours to finish rebuilding.
If you have multiple disk failures and your RAID-5 logical status is Offline, you
must recreate the RAID-5 array. For more information on disk removal and
replacement procedures, see the Cisco Wide Area Application Services
Configuration Guide,
Chapter 15, "Maintaining Your WAAS System."

Replacing a Power Supply

The WAE supports two hot-swap power supplies.
If the device has two power supplies and you remove either of them, the device
Note
will not have redundant power; if the device power load exceeds 835 W, the device
might not start or might not function correctly.
Never remove the cover on a power supply or any part that has the following
Warning
label attached.
Hazardous voltage, current, and energy levels are present inside any
Cisco Wide Area Application Engine 7341, 7371, and 674 Hardware Installation Guide