echnical
ulletin
T
B
PAGE: 6/9
Reissued:04-Mar-14
Model:
Date:
No.:
Aries-P1.5/C1.5
11-Dec-13
RM077100a
SMC analysis file
Following are the 7 spreadsheets "a" ~ "g" in the SMC analysis file, which contain charts
and illustrations so that machine conditions can be verified at a glance.
a) PV, Coverage
b) PM parts usage rate
When PM parts reach 90~100% of the yield, usage rates turn into Blue.
When PM parts exceed the yield, usage rates turn into Red.