T
B
echnical
ulletin
PAGE: 5/11
Model:
Date:
No.:
AG-P1 / C1
20-Apr-11
RM077024
Step 1-3. Remove a total of twelve Transport Rollers from the unit in the following order.
3. Remove the two rollers from the rear side.
2. Remove the retaining ring,
gear, and ball bearing.
1. Remove the knob,
bracket and gear.
5. Remove the ten rollers from the rear side.
4. Remove the retaining ring and bearing.
The following two types of rollers are removed from the unit.
Transport Roller: Knob; x2
Transport Roller: Duplex; x10