Download Print this page

Alcatel-Lucent 7330 Product Information Manual page 250

Intelligent services access manager fiber to the node
Hide thumbs Also See for 7330:

Advertisement

6
7
8
9
10
11
12
13
14
15
16
Alcatel-Lucent 7330/7302 ISAM FTTN R04.02.41
3FE 54017 AAAA TCZZA
Figure NTP 124-4: I-241G-B indoor ONT connections
POTS1
POTS2
1
U
S
B
2
TV
RF video
Phone
coaxial
connectors
connector
(RJ-11)
Connect the Ethernet cables to the RJ-45 ports (DLP 101).
Connect the POTS cables (DLP 115).
Connect the SC/APC fiber optic cable (DLP 117).
Warning — Be careful to maintain a bend radius of no less than 1.5
inches (3.8 cm) when connecting the fiber optic cable. Too small of a
bend radius in the cable can result in damage to the optic fiber.
Install the power supply according to manufacturer specifications.
Note — Observe the following:
Units must be powered by a Listed or CE approved and marked
limited power source power supply with a minimum output rate of
12 V dc, 1.25 A.
Connect the power cable with an 8-pin Molex connector to the ONT unit.
Power up the ONT unit by using the ON/OFF power switch.
If necessary, reset the ONT (DLP 118).
Verify the ONT LEDs, voltage status, and optical signal levels (DLP 119).
Activate and test the services (DLP 120).
If used, configure the SLID (DLP 121).
STOP. This procedure is complete.
December 2010
Edition 01 ONT Product Information Guide
NTP 124 — Install an I-240G-B or I-241G-B indoor ONT
Power connector
LAN1
LAN2
LAN3
LAN4
Ethernet
On/off
ports
(RJ-45)
Fiber
POWER
optic
connector
20429
NTP 124-5

Advertisement

loading

This manual is also suitable for:

7302