Acceptance Test Structure - Siemens SINAMICS S120 Function Manual

Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

9.10.1

Acceptance test structure

Authorized person, acceptance report
The test of each SI function must be carried out by an authorized person and logged in the
acceptance report. The report must be signed by the person who carried out the acceptance
test. Access rights to SI parameters must be protected by a password. This procedure must
be documented in the acceptance report - the password itself must not appear there.
Authorized in this sense refers to a person who has the necessary technical training and
knowledge of the safety functions and is authorized by the machine manufacturer to carry
out the acceptance test.
Note
Further information
• Note the information in Section "Commissioning the "STO", "SBC" and "SS1" functions
• The acceptance report presented below is both an example and recommendation.
• An acceptance report template in electronic format is available at your local Siemens
Note
PFH values
The PFH values of the individual SINAMICS S120 safety components can be found at:
http://support.automation.siemens.com/WW/view/en/28556736
Necessity of an acceptance test
A complete acceptance test (as described in this section) is required after initial
commissioning of Safety Integrated functionality on a machine. The acceptance tests must
be carried out for each individual drive. Safety-related function expansions, transfer of the
commissioning settings to other series machines, hardware changes, software upgrades or
similar, permit the acceptance test to be performed with a reduced scope if necessary. A
summary of conditions which determine the necessary test scope or proposals in this context
is provided below.
Drive functions
Function Manual, (FH1), 01/2013, 6SL3097-4AB00-0BP3