Table 30: Rack Requirements for an MX10016 (continued)
Rack Requirement
Rack connection to building structure
Clearance Requirements for Airflow and Hardware Maintenance for an
MX10016
When planning the site for an MX10016 router installation, you must allow sufficient clearance around
the installed chassis for cooling and maintenance (see
NOTE:
A minimum clearance space of half an inch from the bottom of the chassis is required to
easilyy remove and insert the fan tray.
Figure 40: Clearance Requirements for Airflow and Hardware Maintenance for an MX10016 Chassis
24" ( 6 1cm)
Front mounting flange
Clearan ce requi red
for main t enan ce
Ports
19"
(4 8 .3 cm)
(Mounting
flange
width)
5.1" (13 cm.)
Cable management depth
6.1" (15.5 cm.)
Front panel depth
12" (30.5 cm.)
For airflow
Follow these guidelines:
Guidelines
Secure the rack to the building structure.
If earthquakes are a possibility in your geographical area, secure the
rack to the floor.
Secure the rack to the ceiling brackets as well as wall or floor brackets
for maximum stability.
Figure 40 on page 95
Clearan ce requi red
35 "
(88 .9 cm)
3" (7.6 cm)
32 "
(81 .3 cm)
12" (30.5 cm)
For airflow
for MX10016).
24 " ( 6 1cm)
f or main t enan ce
FRUs
17.4"
(4 4 .2 cm)
4 " (10.2 cm)
Power cable depth