3
Installing the Module
Flow Connections to the Pump
8 If the pump is not part of an Agilent 1290 Infinity system stack or placed on
9 Fill solvent reservoirs with your mobile phase.
10 Fill solvent lines with a syringe; prime, purge and condition your pump
46
the bottom of a stack, connect the waste tube to the waste outlet of the
pump leak handling system.
before first use.
1290 Infinity Quaternary Pump User Manual