Agency Approval - Avaya P333R User Manual

Stackable 3rd layer switch
Table of Contents

Advertisement

Agency Approval

The transceivers comply with:
EMC Emission: US – FCC Part 15, Subpart B, Class A;
Europe – EN55022 class A
Immunity: EN50082-1
Safety: UL for US UL 1950 Std., C-UL (UL for Canada) C22.2 No.950 Std., Food
and Drug Administration (FDA) 21 CFR 1040.10 and 1040.11, and CE for
Europe EN60950 Std. Complies with EN 60825-1.
MTBF
The Mean Time Between Failures (MTBF) for the X330G2 Expansion Sub-module is
594,639 hours.
X330GT2 Gigabit Ethernet Expansion Sub-module
The X330GT2 Expansion sub-module provides two copper Gigabit Ethernet
1000Base-T ports.
Note: The X330GT2 module is only supported by Avaya P330 embedded software
versions 2.4 and higher.
Installing the Expansion Sub-module in the Avaya P330
1
Remove the blanking plate or other sub-module (if installed).
2
Insert the sub-module gently into the slot, ensuring that the Printed Circuit
Board (PCB) is aligned with the guide rails.
The PCB not the metal base plate fits into the guide rail.
3
Press the sub-module in firmly until it is completely inserted into the
Avaya P330.
4
Gently tighten the two screws on the front panel of the expansion sub-module
by turning the screws.
Note: The expansion sub-modules contain components sensitive to electrostatic
discharge. Do not touch the circuit board unless instructed to do so.
Avaya P333R User's Guide
Appendix B
Specifications
241

Advertisement

Table of Contents
loading

Table of Contents