2LK/2LN/2LM/2LC
1-2-2 Unpacking and installation
(1) Installation procedure
Start
Unpacking
Installing the waste toner box
Replacing operation panel sheet
Removing the eject spacer
(230 V specifications only)
Removing the tapes
Install the original platen or DP (option)
Installing the paper feeder (option)
Install other optional devices
Release the lock of the scanner mirror frame
Install the cassette heater (option)
Release of lift plate stopper
Connect the power cord
Loading paper
Adjusting the image
Installing the toner containers
Completion of the machine installation.
Unlocking the developer waste
1-2-2