2NC/2NF/2NG/2NN/3P7/3P8/3P9
1-2-2 Unpacking and installation
(1) Installation procedure
Start
Unpacking
Remove the tapes and spacer
Connect the power cord
Installing toner
Install the paper feeder (option)
Installing software
Install the document processor (option)
Output an own-status report
Install the platen cover (option)
(maintenance item U000)
Install the other optional devicees
Cleaning the counter
(maintanance item U927)
Load paper
Exit maintenance mode
Install the toner container
Make test copies
Connecting USB cable
Attaching the cover label
Completion of the machine installation
1-2-2