Figure 65: Switch Initialization Messages (Continued) - Allied Telesis AT-x510-28GTX Installation Manual

X510 series gigabit ethernet switches
Hide thumbs Also See for AT-x510-28GTX:
Table of Contents

Advertisement

Received event poefw.done
Starting base/portmapper...
Received event syslog.done
Starting base/reboot-stability...
Starting base/autofs-card...
Checking system reboot stability...
Starting base/cron...
Starting base/appmond...
Starting hardware/openhpi...
Starting hardware/timeout...
Starting base/inet...
Starting base/modules...
Received event modules.done
Received event board.inserted
Received event hardware.done
Starting network/startup...
Starting network/stackd...
Starting network/election.timeout...
Received event network.enabled
Initializing HA processes:
openhpid, hostd, cntrd, nsm, auth, epsr, hsl
imiproxyd, irdpd, lldpd, loopprot, mstp, ospf6d, ripd
ripngd, rmon, sflowd, udldd, vrrpd, bgpd, imi
lacp, ospfd, pdmd, pimd
Received event network.initialized
03:44:11 awplus-1 VCS[826]: No neighboring members found, unit may be in a
stand alone configuration
03:44:11 awplus-1 VCS[826]: Startup speed can be improved by adding 'no stack
1
enable' to configuration
Received event vcs.elected-master
03:44:11 awplus-1 VCS[826]: Member 1 (0015.774f.ed30) has become the Active
Master
Assigning Active Workload to HA processes:
hsl, nsm, rmond, sflowd, vrrpd, irdpd, lacpd
lldpd, loopprotd, mstpd, authd, epsrd, imi, imiproxyd
Figure 65. Switch Initialization Messages (Continued)
x510 Series Installation Guide for Stand-alone Switches
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
111

Advertisement

Table of Contents
loading

Table of Contents