Cabling Switches with AT-StackOP/0.3 or AT-StackOP/9.0
Transceivers
For guidelines to cabling the switches with AT-StackOP/0.3 or AT-
StackOP/9.0 fiber optic transceivers, refer to "Planning a Stack" on
page 67. To cable switches with fiber optic transceivers, perform the
following procedure:
1. Remove a dust cover from either the S1 or S2 slot on the switch.
2. To install the transceiver in the S1 slot, position it with the handle on
top, as shown in Figure 54. To install it in the S2 slot, position it with
the handle on the bottom.
Handle
Figure 54. Handle on the AT-StackOP/0.3 and AT-StackOP/9.0
3. Slide the transceiver into the slot until it clicks into place, as shown in
Figure 55 on page 98.
x510 Series Installation Guide for Stand-alone Switches
Transceivers
97