Chapter 7: Powering On the Stack
106
For the DC powered AT-x510-28GSX-80 Switch, connect the
grounding and power wires to the switch, as explained in "Wiring the
DC Connectors on the AT-x510-28GSX-80 Switch" on page 76, and
power on the DC circuits.
Consider the following items as you power on a switch:
Connecting the two power cords to power sources that are on
different circuits will provide power redundancy to the switch in the
event a circuit fails.
Refer to "Power Specifications" on page 131 for the power
specifications of the switches.
Warning
Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord.
Note
Pluggable Equipment. The socket outlet shall be installed near the
equipment and shall be easily accessible.
2. Wait two or three minutes for the switches to select a master switch
and to assign the ID numbers.
At this point, the stack is operational. The ID numbers are
automatically stored in special files in the flash memories of the
switches and are retained by the devices even if you reset or power
cycle the stack.
3. To continue with the installation, go to "Verifying the Stack" on
page 107.