Allied Telesis AT-x510-28GTX Installation Manual page 7

X510 series gigabit ethernet switches
Hide thumbs Also See for AT-x510-28GTX:
Table of Contents

Advertisement

Figures
and AT-x510L-52GP Switches .............................................................................................................................................21
Figure 4: Back Panel of the AT-x510-28GPX and AT-x510-52GPX Switches .....................................................................22
Figure 5: Back Panel of the AT-x510L-28GT and AT-x510L-52GT Switches ......................................................................23
Figure 6: Back Panel of the AT-x510L-28GP and AT-x510L-52GP Switches ......................................................................23
Figure 7: Back Panel of the AT-x510-28GSX-80 DC Powered Switch.................................................................................23
Figure 8: x510 Series Management Panel ...........................................................................................................................24
AT-x510L-52GT Switches.....................................................................................................................................................35
AT-x510L-52GP Switches ....................................................................................................................................................37
Figure 11: SFP Slot LEDs on the AT-x510-28GSX and AT-x510-28GSX-80 Switches .......................................................39
Figure 12: SFP+ Slot LEDs ..................................................................................................................................................40
Figure 13: Switch ID LED .....................................................................................................................................................41
Figure 14: Switch ID LED .....................................................................................................................................................42
Figure 15: Switch ID LEDs in the Low Power Mode .............................................................................................................43
Figure 16: Stacking Transceivers .........................................................................................................................................52
Figure 17: Stack of Two Switches in the Linear Topology....................................................................................................54
Figure 18: Stack of Four Switches in the Linear Topology ...................................................................................................55
Figure 19: Stack of Two Switches in the Ring Topology ......................................................................................................56
Figure 20: Stack of Four Switches in the Ring Topology......................................................................................................57
Figure 21: PORT Parameter in the Command Line Interface...............................................................................................60
Figure 22: Components of the x510 Series Switches...........................................................................................................69
Figure 23: Turning the Switch Upside Down ........................................................................................................................73
Figure 24: Removing the Rubber Feet .................................................................................................................................73
Figure 25: Attaching the Equipment Rack Brackets .............................................................................................................74
Figure 26: Attaching the Equipment Rack Brackets (Continued) .........................................................................................75
Figure 27: Mounting the Switch in an Equipment Rack ........................................................................................................75
Figure 28: Ring Lug ..............................................................................................................................................................76
Figure 29: Stripping the Stranded Grounding Wire...............................................................................................................77
Figure 30: Attaching the Stranded Grounding Wire to the Ring Lug ....................................................................................78
Figure 31: Removing the Nut from the Grounding Post........................................................................................................78
Figure 32: Installing the Grounding Wire ..............................................................................................................................79
Figure 33: Loosening the Two Captive Screws on the DC Connector .................................................................................80
Figure 34: Removing the DC Connector...............................................................................................................................80
Figure 35: Loosening the Captive Screws on the DC Connector .........................................................................................81
Figure 36: Stripping a Stranded Power Wire ........................................................................................................................81
Figure 37: Inserting the RETURN Wire ................................................................................................................................81
Figure 38: Inserting the -48/-60VDC Wire ............................................................................................................................82
Figure 39: Sliding the DC Connector into the Switch............................................................................................................82
Figure 40: Securing the DC Connector to the Switch ...........................................................................................................83
Figure 41: Connecting the Management Cable to the Console Port ....................................................................................87
Figure 42: User Exec Mode Prompt .....................................................................................................................................88
Figure 43: Moving to the Privileged Exec Mode with the ENABLE Command .....................................................................88
Figure 45: Activating VCStack with the STACK ENABLE Command...................................................................................89
Figure 46: Returning to the Privileged Exec Mode with the EXIT Command .......................................................................89
Figure 47: Saving the Change with the WRITE Command ..................................................................................................89
7

Advertisement

Table of Contents
loading

Table of Contents