Installing The Outer Rail - QUANTA STRATOS S200 Series S200-X12TS Technical Manual

2-socket general purpose 1u server
Table of Contents

Advertisement

R
K
A
AIL
IT
SSEMBLY

Installing the Outer Rail

1. Align the screws on the outer rail with the screw holes on
the front cabinet column.
2. Guide the screws on outer rail through the screw holes on
the front cabinet column until the rail clicks in place.
3. Extend the rear side of the outer rail, to reach the rear
cabinet column.
4. Guide the screws on outer rail through the screw holes on
the rear cabinet column until the rail clicks in place.
2
Installing the Outer Rail
5. Repeat the previous steps for the other side.
Installing the System Into the
Rack
!
Prior installing the system into the slide rail, make sure the
ball bearing retainer is locked forward.
!
Heavy object. Two people are required to safely handle the
server. Always ask for assistance to install or remove the
server.
4
1. Align the inner rail with the outer rail.
2. Horizontally install the system half way into the slide rail.
3. Slide the release tab into
4. Slide the server into the rails till flush with the rack.
6-3
I
NSTALLING THE
WARNING!
WARNING!
Aligning the Rails
locked
position.
S
I
R
YSTEM
NTO THE
ACK

Advertisement

Table of Contents
loading

Table of Contents