Toro Workman HD Series Service Manual page 138

Hide thumbs Also See for Workman HD Series:
Table of Contents

Advertisement

10.Install PTO cover:
A. Insert new oil seal into PTO cover. Apply multi−
purpose grease to lip of oil seal.
B. Insert alignment pins into PTO housing.
C. Apply silicone sealant onto mating surface of
PTO cover.
D. Install PTO cover. Secure cover with cap screws,
nut and lock washers. Torque fasteners from 18 to
22 ft−lb (24.5 to 29.5 N−m).
11. Install PTO to transaxle (see PTO Removal and
Installation in this chapter).
Drive Train
Page 6 − 68
18.5 to 22 ft−lb
(24.5 to 29.5 N−m)
Figure 143
Workman HD Series

Advertisement

Table of Contents
loading

Table of Contents