Important!
You must reinstall the bezel
before reinstalling the side
and wrap-around panels.
6
Maintaining and Troubleshooting the Gateway ALR 8200 Server
Closing the system
Before closing the system, verify that all connectors and boards are
properly installed and firmly seated.
Reinstalling the bezel
Position the bezel to the front of the chassis so that the bezel pegs are
1.
aligned with the mount holes on the front of the chassis. See Figure 4.
2.
Carefully thread the ribbon cables through the openings in the chassis
and connect them to the appropriate connectors. See Figure 7 on
page 10 for the locations of the connector on the system board.
Figure 4: Reinstalling the Bezel
Need help?
Do you have a question about the ALR 8200 and is the answer not in the manual?