Scope of delivery and installation

The boiler is supplied fully assembled and protected. The boiler is
placed on a pallet ( 28" (70 cm) x 51" (130 cm) x 57" (145 cm)), which
can be transported with a pallet truck, hand truck, forklift truck or 4-
wheel transport boards. The packaging passes through all standard
doors (minimum width of 29" (74.5 cm)).
The boiler is installed as follows:
Position the pallet with the boiler in the boiler room;
Remove the fixing bands and all other packaging (some
components are packaged in the polystyrene cap);
Lift the boiler from the pallet;
Slide the boiler into the required position, using the recessed
handles in the boiler base;
Cover the boiler and do not operate it while dust creating
construction processes or insulation to the pipe work etc. are
carried out in the plant room.
Install the boiler such that the gas ignition system components are
protected from water (dripping, spraying, rain, etc.) during
operation and service.
Do not install the boiler on carpet or other combustible materials.
Do not install the boiler near combustible constructions, vent
connector, and steam and hot-water pipes.