Suzuki GSR600 Service Manual page 111

Table of Contents

Advertisement

CONROD BIG END SIDE CLEARANCE
• Inspect the conrod side clearance by using a thickness
gauge.
• If the clearance exceeds the limit, remove the conrod and
inspect the conrod big end width and the crank pin width.
• If the width exceed the limit, replace conrod or crankshaft.
 Conrod big end side clearance:
Service Limit: 0.30 mm
 09900-20803: Thickness gauge
 Conrod big end width:
Standard: 19.95 – 20.00 mm
 09900-20205: Micrometer (0 – 25 mm)
 Crank pin width:
Standard: 20.10 – 20.15 mm
 09900-20605: Dial calipers (1/100 mm, 10 – 34 mm)
CONROD-BIG END BEARING INSPECTION
• Inspect the bearing surfaces for any sign of fusion, pitting,
burn, or flaws. If any, replace them with a specified set of
bearings.
CONROD-BIG END BEARING SELECTION
• Place the plastigauge axially along the crank pin, avoiding the
oil hole, as shown.
 09900-22301: Plastigauge
• Tighten the conrod bearing cap bolts to the specified torque,
in two stages. (3-70)
* Apply engine oil to the bearing cap bolt.
* Never rotate the crankshaft or conrod when a piece
of plastigauge is installed.
*1: Face the intake side.
ENGINE
*1
3-59

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2006 gsr600

Table of Contents