The installation is then controlled via the automatic systems in accordance with the configuration of the application:
inversion of normal/emergency source
grid coupling
etc.
If no faults are present, automatic mode can be activated by pressing Auto.
The test starting phase is then initiated after pressing 1 on the test keypad.
Pressing 1 on the test keypad brings up the following window for selecting the test type.
15/07/09
19 : 10 :00
- 1 -
Function keys
Using the KERYS Tactil Man-Machine Interface, the under
load test is started by pressing the corresponding key.
Tests
GS 1
Operation
I1(A)
2701
Test selected
Select the test to be carried out
Under load
test
Speed (rpm)
Operating time:
+ Speed
- Speed
- 2 -
Synchronisation column
113/285
Manu
F.P
0,9 L
No load
Esc
test
1505
10 :05
+ U
-U
- 3 -
Power plant
measurements summary
Using the KERYS Tactil Man-Machine Interface, the off load
test is started by pressing the corresponding key.
Faults
Alarms
Q (kVAr)