Fig. 46
Engine Wiring
1. With key switch OFF, re-connect equipment
wiring harness to engine wiring harness.
Disconnect harness at solenoid.
2. Insert RED meter test lead (2) into GRAY wire
(1) in solenoid connector.
3. Attach BLACK test lead to a good ground, Fig. 47.
4. Turn key switch to ON position. Meter should
display battery voltage.
If meter does not display battery voltage, replace
engine wiring harness. If meter displays battery
voltage, test the solenoid.
Fig. 47
51