Suzuki GSX-R750 Service Manual page 444

Hide thumbs Also See for GSX-R750:
Table of Contents

Advertisement

CKP SENSOR PEAK VOLTAGE
• Remove the front seat. (8-7)
NOTE:
Be sure that all couplers are connected properly and the battery
used is in fully-charged condition.
• Disconnect the both couplers 1.
• Connect the multi-circuit tester with peak volt adaptor as fol-
lows.
• Measure the CKP sensor peak voltage between Orange/Blue
and Green/White lead wires at the ECM coupler (Black) A.
G/W wire (+ Probe) – O/Bl wire (- Probe)
 09900-25008: Multi-circuit tester set
09900-25009: Needle pointed probe set
* Before using the multi-circuit tester and peak volt
adaptor, be sure to refer to the appropriate instruc-
tion manual.
* Normally, use the needle pointed probe to the back-
side of the lead wire coupler to prevent the terminal
bend and terminal alignment.
• Shift the transmission into the neutral and turn ignition switch
"ON".
• Crank the engine a few seconds with the starter motor by
depressing starter button and check the CKP sensor peak
voltage.
• Repeat the above test procedure a few times and measure
the highest peak voltage.
 Tester knob indication: Voltage ()
 CKP sensor peak voltage: 0.28 V and more
A Black coupler
(Orange/Blue – Green/White)
ELECTRICAL SYSTEM
G/W
O/Bl
ECM
CKP sensor
coupler
coupler
O/Bl
G/W
G/W
G/W
W
CKP sensor
9-27
Peak
volt
adaptor

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gsx-r600 2006Gsx-r600 20072007 gsxr 6002006 gsxr 600

Table of Contents