Suzuki GSX-R750 Service Manual page 210

Hide thumbs Also See for GSX-R750:
Table of Contents

Advertisement

4-54
FI SYSTEM DIAGNOSIS
Step 1 (When indicating P0110-H:)
1) Turn the ignition switch OFF.
2) Lift and support the fuel tank. (5-3)
3) Check the IAT sensor coupler for loose or poor contacts.
If OK, then check the IAT sensor lead wire continuity.
4) Disconnect the IAT sensor coupler and ECM coupler.
5) Check the continuity between Dg wire A and terminal Q.
6) Also, check the continuity between B/Br wire B and terminal
S.
 IATS lead wire continuity: Continuity ()
 09900-25008: Multi-circuit tester set
09900-25009: Needle pointed probe set
 Tester knob indication: Continuity test ()
When using the multi-circuit tester, do not storongly
touch the terminal of the ECM coupler with a needle
pointed tester probe to prevent the terminal damage
or terminal bend.
Is the continuity OK?
YES
Go to Step 2.
NO
Dg wire or B/Br wire open
7) After repairing the trouble, clear the DTC using SDS tool.
(4-27)
1
1
(Black)
ECM couplers (Harness side)
!
(Gray)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gsx-r600 2006Gsx-r600 20072007 gsxr 6002006 gsxr 600

Table of Contents