. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2-3
Installation of ProLiant Storage System /U
Rack Systems
The Rack-Mountable ProLiant Storage System /U is one of the lightest
weight rack components and should be located higher in the rack than
many other components. For help in locating the storage system in the
19-inch rack, refer to the Rack Builder software installation utility
available from your local Compaq Reseller or Authorized
Service Provider.
A grounded electrical outlet that is easily accessible and located as near
the storage system as possible
Installing the Storage System
Using the guidelines above, install the ProLiant Storage System /U as
explained below.
Tower Systems
Place the storage system in its chosen location. Proceed to "Installing the Hot-
Pluggable Hard Drives" later in this chapter.
Rack Systems
To install Rack-Mountable ProLiant Storage System /U in a 19-inch rack, you
must perform these steps.
IMPORTANT: Before installing the storage system in a rack, read "Rack Warnings
and Precautions" at the end of this chapter for important information regarding
proper rack installation.
1.
Remove any blank panels from the chosen rack location.
2.
Use the supplied template to mark the location of the mounting
hardware on the vertical mounting rails of the rack cabinet. One side of
the template is used for the front rails of the rack and the other side for
the rear rails. Instructions are included on the template.
Compaq ProLiant Storage System /U User Guide
Need help?
Do you have a question about the ProLiant Storage System U1 and is the answer not in the manual?
Questions and answers