Removing A Resilient Link; Swapping Over Active Links; Adding A Port To A Trunk - 3Com SuperStack II Manual

Hide thumbs Also See for SuperStack II:
Table of Contents

Advertisement

Removing a Resilient
Link
Swapping over Active
Links
Adding a Port to a
Trunk
You can remove resilient links from the Switch units within the stack
using the
remove
To remove a resilient link:
1 At the Top-level menu, enter:
feature resilience remove
The following prompt is displayed:
Select resilient link index (1,2):
2 Enter the resilient link index number for the resilient link that you wish to
remove.
You can swap over the resilient links on the Switch units within the stack
to redesignate the active link by using the
Resilience menu.
To swap over the active link:
1 At the Top-level menu, enter:
feature resilience swap
The following prompt is displayed:
Select resilient link index (1,2):
2 Enter the resilient link index number for the resilient link that you wish to
become active.
You can add a single port to a trunk on the current Switch unit using the
command on the Trunk menu.
addPort
To add a port to a trunk:
1 At the Top-level menu, enter:
feature trunk addPort
The following prompt is displayed:
Select trunk index (1-2):
2 Enter the index number of the trunk that you wish to add a port to.
The following prompt is displayed:
Enter ports (1,2,7):
Displaying and Changing System Feature Information
command on the Resilience menu.
command on the
swap
131

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SuperStack II and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF