Installation And Initial Operation; Installation; Preparation - Fujitsu PRIMERGY TX600 User Manual

Table of Contents

Advertisement

02
TX600

Installation and initial operation

Installation

Preparation

Unpacking the server
Do not unpack the server until it is at its installation location.
!
Ask someone for help with carrying the server.
If you discover that the delivery was damaged during transport or does
not correspond to the delivery note, notify your supplier immediately!
Ê Unpack all parts.
Ê Carry the server to its installation location.
Installation steps for the floor-standing server
Connect the devices to the server according to the configuration.
Connect the server to the mains.
Route the cables.
Installation steps for the rack server
Mount the assembly kit and insert the server (see order lists for location
diagram prepared with Rack Architect); see
Connect the devices to the server according to the rack configuration.
Connect the server to the mains.
Route the cables.
U41057-J16-Z146-1-76
page 02-TX600-170
October 2003
ff.
02
TX600
21

Advertisement

Table of Contents
loading

Table of Contents