10.2 Checklist For Periodic Inspection And Maintenance - REMEHA Gas 310 ECO PRO-285 Installation, User And Service Manual

Gas 310 eco pro series, gas 610 eco pro series
Table of Contents

Advertisement

10. Checklists

10.2 Checklist for periodic inspection and maintenance

No. Inspection and/or service activities
1
Checking the hydraulic pressure
2
Checking the ionization current
3
Check the water quality
4
Checking the air supply connections and flue gas
discharge connections
5
Checking the gas filter for pollution
6
Checking combustion (CO
7
Check the air supply hose
8
Check the dirt trap
9
Check the air box
10
Check the air pressure differential switch PS
11
Check the gas leakage control VPS
(If installed)
12
Check the minimum gas pressure switch GPS
(If installed)
13
Clean the fan and the venturi
14
Clean and inspect the non-return valve
15
Replacing the ionization/ignition electrode
17
Cleaning the gas filter
16
Clean and inspect the burner
18
Clean the burner area
19
Cleaning the heat exchanger
20
Cleaning the condensate collector
21
Cleaning the siphon
22
Assembling the boiler (Replace all removed gaskets)
23
Put the boiler back into operation
24
Confirmation of inspection
Date
Company name, signature of engineer
78
) (Full load/Part load)
2
Gas 310 ECO PRO - Gas 610 ECO PRO
Confirmation and date
(dd-mm-yy) (dd-mm-yy) (dd-mm-yy) (dd-mm-yy) (dd-mm-yy)
160514 - 125467-05

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents